TwitApp: In-Product Micro-Blogging for Design Sharing
Abstract
We describe TwitApp, an enhanced micro-blogging system integrated within AutoCAD for design sharing. TwitApp integrates rich content and still keeps the sharing transaction cost low. In TwitApp, tweets are organized by their project, and users can follow or unfollow each individual project. We introduce the concept of automatic tweet drafting and other novel features such as enhanced real-time search and integrated live video streaming. The TwitApp system leverages the existing Twitter micro-blogging system. We also contribute a study which provides insights on these concepts and associated designs, and demonstrates potential user excitement of such tools.
BibTeX
@inproceedings{10.1145/2047196.2047219,
abstract = {We describe TwitApp, an enhanced micro-blogging system integrated within AutoCAD for design sharing. TwitApp integrates rich content and still keeps the sharing transaction cost low. In TwitApp, tweets are organized by their project, and users can follow or unfollow each individual project. We introduce the concept of automatic tweet drafting and other novel features such as enhanced real-time search and integrated live video streaming. The TwitApp system leverages the existing Twitter micro-blogging system. We also contribute a study which provides insights on these concepts and associated designs, and demonstrates potential user excitement of such tools.},
address = {New York, NY, USA},
author = {Li, Wei and Grossman, Tovi and Matejka, Justin and Fitzmaurice, George},
booktitle = {Proceedings of the 24th Annual ACM Symposium on User Interface Software and Technology},
doi = {10.1145/2047196.2047219},
isbn = {9781450307161},
keywords = {twitter, micro-blogging, sharing, design},
location = {Santa Barbara, California, USA},
numpages = {10},
pages = {185–194},
publisher = {Association for Computing Machinery},
series = {UIST '11},
title = {TwitApp: In-Product Micro-Blogging for Design Sharing},
url = {https://doi.org/10.1145/2047196.2047219},
year = {2011}
}